Lofteze - About us - January 2012

Here you can find out all about Lofteze and the conversion process.

Lofteze understand that for many people this will be the first time that they have entered into such a large scale of work and it can seem a little daunting.

We get many questions from our customers enquiring about what procedures we will go through and what does the customer need to do from their side?

Lofteze Ltd - Loft Conversion Experts Lofteze are committed to the highest standards of quality in all our work and in order to help clarify the process we have produced a list of steps that a standard conversion could go through.

Initially we would suggest that you spend some time thinking about what sort of layout you would envisage for your new conversion, we can help you by providing a free no obligation survey during which we can recommend a layout based on our extensive experience.

 

Lofteze Ltd - Loft Conversion Experts If you live in a semi-detached or terraced property you will need to look into the Party Wall Act, which covers the shared loft wall(s) with your neghbours.

For more information on the Party Wall Act visit

The Office of Public Sector Information.

 

Lofteze Ltd - Loft Conversion ExpertsLofteze Ltd - Loft Conversion ExpertsOnce you have decided upon your conversion and layout we will request a deposit, there will then be architect visits (1 week) and the drawings will be submitted to the council and you will need to pay the local council building inspection fees (These vary slightly from borough to borough).

After planning approval, work can begin.

 

These are generally the steps that will take place:

  • Scaffolding (4-6 weeks)
  • Initial loft clearance
  • Materials arrive on site
  • Structural floor placed in position
  • 1st visit from building inspector
  • Dormer Erected
  • Roof completed to avoid leaks
  • All conversion windows installed
  • Insulation completed

At this point we will cut through from the loft to the floor below. Prior to this all work is carried out through the roof to ensure that any disturbance to your home is kept to a minimum.

  • Stairs installed
  • First fix
  • Electrics - Wired through stud walls / ceiling joists to switches, sockets and lights before plaster boarding
  • Plumbing - Pipes run under floor for radiators, waste, soil stack and shower valve
  • 2nd Visit from building inspector
  • Dry lining
  • Loft walls Plastered
  • 2nd Fix of electrics and plumbing which includes fitting of the bathroom suite and all the electrical fittings
  • 2nd Fix carpentry; doors, skirtings, architraves and stair handrail and spindles
  • 3rd and final visit from building inspector

This information is meant as a customer guideline only and may vary depending on your building and the area you live in.

 